Installation:

  • Please ensure the correct current flow direction.
  • Please install the sensor either with the supplied shrinking tube or with an CFK enclosure for insulation.
  • The input voltage should be 5.20-5.35V. The matching BEC's are the 2-6S / DF13 and the 4-14S / DF13 power supplies.
  • It is recommended to connect the BEC input wires as close as possible to the main battery.

Required installation space:

31x17x10mm -> PCB only

CFK enclosure:

Setup in MissionPlanner:

Troubleshooting:

Just in case you having trouble to get current or voltage readings from the sensor board, then please check the following.

  • Is the input voltage in the range of 5.20-5.35V ?
  • Is the blue LED on the sensor board on ?
  • Is the sensor installed in the correct current flow direction ?